Brickwork laid in a lime-based mortar, with brick detailing brushed back on a Grade II Listed Building in Ledbury.
March 2019
Brickwork laid in a lime-based mortar, with brick detailing brushed back on a Grade II Listed Building in Ledbury.
March 2019