After the Storm

A corridor strewn with building equipment such as tool boxes and ladders. The top half of the walls are painted white, the lower half have been stripped and show exposed brick. A red line runs between the two. Communion Architects Hereford.A corridor strewn with building equipment such as tool boxes and ladders. The top half of the walls are painted white, the lower half have been stripped and show exposed brick. A red line runs between the two. Communion Architects Hereford.

We are working with Freedom Church Hereford to repair flood damage from Storm Denis. We are looking to install improvements to reduce the risk of floods in the future.

June 2021


View more photos from our on site work